Saket Infrastructure Logo
SAKET
INFRASTRUCTURE
OSP Background

OSP
OSP (OFC Rollout and O&M)

Railway Worker
Train Station

OSP (OFC Rollout and O&M)


  • arrowSurvey efforts at section level for FTTx/Greenfield with drawings.
  • arrowROW & Liaising with Forest departments.
  • arrowImplementation of OFC laying & Restoration.
  • arrowConnectivity handovers with Splicing & Link testing.
  • arrowLocal access trenching and Cable laying works.
  • arrowSub access wire line connectivity works.
  • arrowRestoration on OFC roads and HDD crossing with departments.
  • arrowOperation and Maintenance of OFC Network with own splicing teams equipped with equipment to ensure dedicated service as required by the customer.
  • arrowEnsure vigilant patrolling & intact function of cut fiber within SLA with required number of FRT’s available, at all times.